Lee Ramsden — Lee Ramsden

Another trip up Blackpool tower.

Blackpool, Blackpool tower, monochrome, black white, reflection, Lancashire photographer, Lee Ramsden

Hello, id like to share some images from another trip working up Blackpool's tower, repairing the illumination lighting at great height. 

Blackpool council, worker, pressure washing, cleaning, sea front steps, golden mile, lee ramsden

Arrived to site early and so I walked the long way there. Was surprised to see early morning council worker cleaning the front. 

Blackpool tower, Wez, IRATA rope access, climbing, electrician

Ropes set, and decent underway. Always told "don't look down" but you have to in this game. 

Blackpool tower, abseiling, industrial worker, in orange ppe, LEE RAMSDEN
IRATA, rope access, level 3, Blackpool, worker, industrial photographer Lee Ramsden

Today repairs ongoing to the heart light. 

Blackpool tower heart light, illuminations
Blackpool illuminations electronics, control gear, electrician, technician

Sophisticated control gear, power the lighting on the Tower, helps it to change colour and be programmable.

blog, sea gull, blackpool, tower, colour, color, lee ramsden

A spectator while working at height. 


 

Thanks for viewing.

 

Lee

Module removal.

BP, Miller, oil and gas, industry decommissioning, Module removal

Hello, 

Today marks the final post in this series. 

It finishes with the big finale - the heavy lift of the accommodation module. 

Stuart Nuttall, project manager, watching

Project manager looks on with anticipation. 

Saipem s7000, M1, crane lifting, offshore, northsea, floating, heavy lift vessel

Nearly 3000 tonnes being lifted, which is effortless for the Saipem S7000. 

Saipem s7000, M1, crane lifting, offshore, northsea, floating, heavy lift vessel

With additional tugger lines fitter, the huge load can be rotated on its axis and and with great prescission laid onto the deck of the S7000. 

 

I hope that this series of blog posts over the last few months, have been of interest.

I have been working in the oil and gas industry for nearly 15 years and this has certainly been the most interesting project I have been involved in. 

The decommissioning of North Sea oil and gas platforms are unfortunately something that we are going to see much more, as the price of oil falls, and the platforms are becoming a less viable option to maintain and keep running. 

 

Thanks

 

Lee

Derrick removal.

Derrick, rigging, lifting, slings installed ready for lift IRATA, rope access, riggers

Hello, 

Today id like to show, the first couple of lifts. 

Above image the rope access riggers, install the cranes lifting equipment. 

derrick lifted off platform, north sea, oil and gas rig
Derrick, remove, lifted with the Saipem 7000, crane, offshore in the north sea
derrick, removal, heavy lift, Saipem, Petrofac, BP, S7000
derrick, sea fastening, welding, on the deck of the S7000

Once landed the derrick is then sea fastened (welded) to the deck of the S7000.

helideck-removal.jpg

The next lift to be completed was the helideck. 

It was amazing to see these huge bits of an oil rig, look almost insignificant against the huge Saipem S7000 cranes. 

 

Thanks